Skip to content

Milestones

Noesis was built in nine milestones. Exit criteria are the definition of done — a milestone closes only when its criterion is proven, and the M3 evaluation gate sits deliberately in front of every quality feature. The board below reflects the as-built order after ADR-38 promoted the dashboard + watcher to M8 and renumbered the MCP v2 checkpoint to M9.

flowchart LR
    M1["M1 Spine<br/>+ Embedder Protocol"] --> M2["M2 Dense<br/>(via Protocol)"] --> M3{"M3 Hybrid<br/>+ EVAL GATE"}
    M3 --> M4["M4 Reranker<br/>(gated on NDCG@10)"]
    M3 --> M5["M5 Structural search<br/>(parallel-safe)"]
    M4 --> M6["M6 MCP tools<br/>(all 6, real agent)"]
    M5 --> M6
    M6 --> M7["M7 Git fast-path"]
    M7 --> M8["M8 Dashboard<br/>+ watcher"]
    M8 --> M9["M9 MCP v2 migration<br/>checkpoint (post 2026-07-28)"]
# Milestone Deliverable Exit criterion (proves) Status
M1 Spine Registration, discovery + filtering (gitignore/binary/secret), SHA-256 diff, SQLite WAL, Embedder Protocol with a fake impl for tests Incremental detection works on a real repo; the interface compiles the whole downstream design Done
M2 Dense cAST chunker → LocalSTEmbedder (CodeRankEmbed) → Qdrant dense-only, REST POST /search NL→code returns sane spans; zero direct SentenceTransformer calls outside the embedder module (CI grep) Done
M3 Hybrid + gate Native BM25 sparse + RRF; 40-query golden set; harness with Recall@10 primary Hybrid beats dense-only on Recall@10, especially the symbol subset — asserted by the harness since ADR-65, not read off a printed table Done
M4 Reranker bge-reranker-v2-m3 on a dedicated worker, rerank flag, lazy load, harness extended with NDCG@10 + latency Measured NDCG@10 delta recorded; default-on/off decided from data → shipped default-off (ADR-35). The NDCG win itself is now asserted every run (ADR-65) Done
M5 Structural search structural_search core fn + REST endpoint, LANGUAGE_MAP, discovery-filter reuse Known patterns return exact expected match sets; skip-listed files never appear Done
M6 MCP FastMCP mounted (shared lifespan), stdio + streamable-HTTP, all six tools; a real agent connected Agent completes a task using search_code → read file, and structural_search, end to end Done
M7 Git fast-path Candidate-set diffing, last_indexed_commit anchor, telemetry Re-index of a large repo with a 3-file change hashes ~3 files; every fallback condition tested Done
M8 Dashboard + watcher Jinja2 monitoring dashboard (overview / project detail / usage), watchdog watcher, per-project flags, device setting, registration + deletion Humans see index health; freshness is automatic when enabled, staleness always visible when not Done
M9 MCP v2 checkpoint Post-2026-07-28: assess stable MCP v2 + FastMCP's compatible range; migrate or explicitly re-pin with a dated revisit Transports pass integration tests against the pinned, decided-upon versions; decision recorded Scheduled — pinned to the upstream 2026-07-28 release date, not to preceding work

M1–M8 are shipped — the feature set documented across Concepts and Reference is the delivered scope. M9 is calendar-pinned: it happens when the MCP v2 stable release lands upstream, which is why the mcp<2 pin is a hard rule until that checkpoint decides otherwise.